DECK COVERING
• Home > BUSINESS > DECK COVERING > POLYURETHANE DECK
◊ POLYURETHANE DECK
Designed as a deck finish material.
The product is designed to be used as deck coverings for decoration of indor areas.
The product has high flexibility and chemical resistance.
① Steel Deck or Concrete
② Primer Coat (0.3㎜)
③ First Base Coat (2㎜)

④ Second Base Coat (2.5㎜)
⑤ Top Coat (0.2㎜)
 
COLOR
MKB 100 - Green
MKB 400/MKH 400 - Green
MKB 900/MKH 900 - Green
MKH 101R/MKN 101H - Clear
DENSITY
Approx 1.3 g/㎤ (applied)
RECOMMENDED THICKNESS
3 ~ 8㎜
 
One set YATOMIX POLYURETHANE DECK consist of
PRIMER COAT
MKB 100 - 4 ㎏/can
FIRST BASE COAT
MKB 400 - 20 ㎏/can
MKH 400 - 8 ㎏/can
SECOND BASE COAT
MKB 900 - 17 ㎏/can
MKH 900 - 17 ㎏/can
TOP COAT
MKB 101R - 6 ㎏/can
MKH 101H - 12 ㎏/can
It is recommended that the product is conditioned to room-temperature before mixing.
Avoid the moisture of subsurface, especially 1 day after rain.
Application thickness is limited to 3mm in one touch coating. The pot-life of mixed product is within 20 min.
 
1) PRE-TREATMENT
The steel deck must be clean, dry and free from grease, oil etc.
2) PRIMER COAT
MKB 100 has to be thoroughly stirred before applying with roller or brush.
3) FIRST BASE COAT
Mix exact quantities of MKB 400 & MKH 400, and then apply the prepared product with trowel or other equipments.
4) SECOND BASE COAT
MKB 900 and MKH 900 are thoughly mixed according to mixing ratio 2:1, Trowel is recom-mended for application.
5) TOP COAT
For top coat MKN 101R should be added with MKN 101H to make low viscosity.
Adding quantities of MKN 101H may be changed depending on working condition, but excessive quantities are to get stain.
 
(at 20℃)
PRIMER COAT : 1 hours
FIRST BASE COAT : 24 hours
SECOND BASE COAT : 12 hours
TOP COAT : 4 hours
※ Dry time may be changed depending on weather condition.
 
SHELF-LIFE
6 months
STORAGE
Unopened in dry rooms with a temperature not exceeding 5℃

※ Standard spec depend as above mentioned, but the spec. may changed by customer's demand and for special use.
 
• POLYURETHANE DECK
Process Item Consumption
(㎏/㎡)
Pot-life
(Mins)
Drying time
(Hours at 20℃)
Foot traffic
(Hours)
5㎜ 6㎜ 7㎜
Primer Coat MKB 100 0.3 0.3 0.3 20 1 6
(After Top
Coating)
First Base Coat MKB 400 2.24 2.8 3.36 20 24
MKH 400 0.90 1.12 1.35
Second Base Coat MKB 900 1.16 1.3 1.56 20 12
MKH 900 1.16 1.3 1.56
Top Coat MKN 101R 0.13 0.13 0.13 30 4
MKN 101H 0.26 0.26 0.26