• Home > BUSINESS > DECK COVERING > INSIDE FLOOR S.B.R
◊ INSIDE FLOOR S.B.R
|
YATOMIX INSIDE FLOOR S.B.R is used as underlay for deck finish materials such as carpets, vinyl sheet etc. and may be a;;lied to hard foundations such as short-primed steel, which recommended be free of dust, oil, grease, dirt, rust etc. |
|
① Steel Deck or Concrete ② Primer Coat (1㎜) |
③ Base Coat (6㎜) ④ Top Coat (1㎜) |
|
|
|
|
Primer, Base, Top Power - Gray L/C 34K - White |
|
|
Approx 1.85 g/㎤ (applied) |
|
|
|
|
|
|
|
|
One set YATOMIX INSIDE FLOOR S.B.R consist of three coats.
|
Primer Powder |
20㎏/bag |
20㎏ |
L/C 34K |
20㎏/can |
8㎏ |
|
Base Powder |
20㎏/bag |
20㎏ |
L/C 34K |
20㎏/can |
8㎏ |
|
Top Powder |
20㎏/bag |
20㎏ |
L/C 34K |
20㎏/can |
8㎏ |
|
|
Coat the mixed compound of primer powder and L/C 34K with brush.
After drying the primer coat, apply the base coat with trowel.
Don't coat the top coat before the base coat be dried completely.
Each prepared compound must be used within 30 minutes. |
|
|
Application is easily performed with trowel, brush or other suitable tools.
The lowest steel temperature is 5℃ Thickness in excess of 10mm will extend to drying time. |
|
|
The curing time is depending on the thickness of the compound.
|
Apply base coat within 2 hours. |
|
|
Apply top coat when base coat completely dried. (approx. 24 hours) |
|
|
Apply applied, 12 hours need to walk. |
|
|
|
|
|
Power - Power-min. 3 months in unsealed package. L/C 34K-min. 6 months in unsealed package. |
|
|
Keep in dry rooms. Do not expose to freezing temperatures. |
|
|
|
• Inside Floor S.B.R |
|
|
Process |
Item |
Consumption (㎏/㎡) |
Pot-life (Mins at 20℃) |
Drying time (Hours at 20℃) |
Foot traffic (Hours) |
6㎜ |
8㎜ |
10㎜ |
Primer Coat |
Primer Powder |
1 |
1 |
1 |
60 - 80 |
1 - 2 |
12 (After Top Coating) |
L/C 34K |
0.4 |
0.4 |
0.4 |
Base Coat |
Base Powder |
8.4 |
11.2 |
14 |
20 - 40 |
12 -36 |
L/C 34K |
0.84 |
1.12 |
1.4 |
Top Coat |
Top Powder |
1 |
1 |
1 |
30 - 50 |
2 - 4 |
L/C 34K |
0.4 |
0.4 |
0.4 |
|
|
|